Contract management in the transportation industry also has a colorful role and many of its projects are carried out in this way. Investigating this issue from different aspects can be effective in the performance of contract managers. With a successful history in the field of contract management, Saqqal Sazeh Tahkeem Banyan Company is aware of these topics and can better manage this management.

Projects related to the transportation industry

Construction of roads, highways and highways
Creating rail lines for trains and subways
Construction of bridges and tunnels

 

The importance of contract management in the transportation industry

The transportation industry is one of the widespread and extensive industries in different societies. The implementation of projects related to this industry should be managed with principles by skilled and experienced people. Contract management can be effective in this field and implement the project according to the desired standards. Due to the extent of this industry, its management faces difficulties and complications. Therefore, completely different actions and measures should be taken for that than simple plans. Today, societies are expanding rapidly and they constantly need to create new projects for transportation industries. Therefore, it is possible to achieve this goal and advance it in a principled way with the contract management method.

The role of the contract manager in the transportation project

A personal contract manager who is able to manage large and important projects. Coordination and control of different parts of the project is also the responsibility of this person. He should organize the programs and coordinate all the employees of the authorities and organizations with each other. A contract manager should even make plans for the post-project completion and maintenance and, if necessary, reconstruction. To face them with full preparation in case of incidents and problems. In this case, he can solve them with predetermined solutions.

Employees will be confused when the operations are not well managed. They do not know when to complete what part of the project. What parts are prioritized and should be implemented sooner and some issues like that that cause delays in the project. But if the contract manager examines these issues, he will advance the program according to the schedule. So, because they do this correctly, the project will not be delayed.

The impact of contract management in the transportation industry

The responsibility and high productivity of employees is another effect that the contract manager creates in the project. When he knows the right behavior and how to persuade employees in an effective way, he can make the goals possible in this field. All these cases are possible if a skilled and expert person manages it and specifies the duties of the employees. It is in this situation that the role of the treaty path becomes important. In fact, according to its measures, it also adjusts the speed of project implementation. Its coordination with different departments can advance this timing correctly and accurately and not cause delays in it.

 

Challenges during project implementation

 

Many risks can threaten projects and make them difficult. The requirement to solve this issue is the principled and correct management of operations to reduce or completely eliminate damages. This goal is realized when the contract manager identifies the risks and comes up with ways to prevent them by understanding them all.

heavy cost

These projects have a large scope and are considered among heavy projects. Therefore, the costs that must be spent for it are high. But with the right measures, expenses are minimized and projects are completed with a smaller budget.

 

Improper natural conditions

Mainly construction, especially in the field of transportation, takes place in places that have open space. This case can be unsuitable for projects in terms of weather conditions. Unsuitable weather conditions slow down the operation or even stop it. When this happens, it will delay its completion. In order to be able to improve these conditions, the contract manager must research the weather conditions in advance. If this situation causes them problems, they should assign the operation to the coming days. Meanwhile, it can carry out all the operations and processes that can be done outside the project location. So that there is no problem for the employees or the project at that time and another part of it is prepared. So in terms of timing, there is no interruption in it

Make changes

Sometimes, it is possible that the project needs to be changed due to some reasons. Or these projects because they have a large scale and a lot of time is needed to complete them. During this period, if there are changes in the rules and regulations, it may conflict with the way the project is implemented. In these two cases, it is possible to stop the project. But if the person who is in charge of managing it resolves these factors, there is no need to stop or make a break. That is, it carries out the operation in a way that is compatible with the laws and does not harm the project. The project will proceed as the client wants. And this work is possible by the contract manager who has skills and can solve the challenges according to his experiences.

Equipment failure

If periodical checks of equipment and tools are not done, technical problems occur during the operation, which results in its delay. Therefore, if there is no interruption in it, the operation will proceed according to the basic and correct plan. The costs are calculated in advance and are determined according to the budget of the project type. The equipment and materials are prepared according to it.